To meet increasing demand and ensure the long-term operability of its power transmission system, Hydro-Québec is currently working to upgrade Guy substation.

Over the next four months, Hydro-Québec will:

  • dismantle the current electrical equipment
  • excavate and decontaminate the soil
  • drive piles