Roads

The Eastmain-1 hydroelectric development is located upstream of Opinaca reservoir. It is connected to
Nemiscau substation by a 69-km road. Nemiscau substation can be reached from Chibougamau, by the Route du Nord (290
km), or from Matagami, by the James Bay highway.
Workcamp

The Eastmain workcamp houses the construction site workers. During the peak period, expected in June 2004,
it will accommodate nearly 2,400 people. Once the work is completed, the workcamp will be dismantled and transported to another
jobsite, and the site will be reforested.
| Area |
Workcamp
(including generator site and heliport) |
700 x 900 m |
| Industrial zone |
95 x 215 m |
| Housing |
Dormitories and studios
(Total: 2,700 beds)
|
103 dormitories
67 studios
|
| Food services |
| Cafeterias |
1,200-seat cafeteria
1,000-seat cafeteria
|
| Snack bar and restaurant |
1 |
| Bar |
1 |
| Recreation |
| Indoor |
Cultural
Arts and crafts
Library and video library
Internet café
Music room and leisure room
Shows
Sports
Billiards
Bowling (4 lanes)
Golf – Golf simulator
Cosom hockey
Ice rink (curling, hockey, broomball, skating)
Physical fitness room, aerobics, and sauna
Ball sports (soccer, basketball, volleyball)
Racquet sports (tennis, badminton)
Game tables (baby-foot, table tennis)
|
| Outdoor |
Cross-country skiing and snowshoeing
Baseball
Mountain biking
Horseshoes and pétanque
Water sports (rowboats, kayaks, pedal boats, fishing) |
| Other services |
Infirmary
Industrial safety
Fire department
Hairdressing and beauty
Banking services
Heliport
Vehicle rental
Post office
Catalogue shopping counter
Gas station
Convenience store
Telephone/Internet in the rooms
Community channel |
|