Power Transmission Projects

Reinforcing the 230-kV and 120-kV transmission grid supplying Bécancour industrial park

At a Glance
Status: Under construction
Region: Centre-du-Québec
Owner: Hydro-Québec TransÉnergie
Documents

Between January and September 2012, Hydro-Québec will rebuild and reroute the transmission system between Nicolet and Bécancour substations. The work has two main objectives: meet the growing demand of Bécancour's industrial park and ensure the reliability of the transmission system.

The work will consist of dismantling and rebuilding, within the same right-of-way, a 230-kV line over 44 km between Nicolet and Bécancour substations.

  • A 31-km long, 230-kV line built on wooden H-frames in 1959, will be rebuilt on steel towers.
  • In the Saint-Grégoire sector, within the municipality of Bécancour, the rebuilt line will follow the widened right-of-way of a 120-kV line over 2.2 km.
  • Between the Saint-Grégoire sector and Bécancour substation, the new line will replace an existing 230-kV line.
  • Commissioning is scheduled for September 2012.

    To find out more about this project, consult the January 2012 Project News bulletin [In French only].

© Hydro-Québec, 1996-2012. All rights reserved.