Power transmission – Integration of wind farms
| Status: | Under construction |
| Region: | Gaspésie |
| Type: | Growth in needs |
| Owner: | Hydro-Québec TransÉnergie |
| Project supervision: | Hydro-Québec Équipement et services partagés |
Goémon–Mont-Louis–Gros-Morne
To bring the output from the future Mont-Louis and Gros-Morne wind farms onto its transmission grid, Hydro-Québec must build a 230-kV line 106.1 km long. The selected route crosses the municipalities of Cap-Chat, Sainte-Anne-des-Monts, La Martre, Marsoui, Rivière-à-Claude, Mont-Saint-Pierre, Saint-Maxime-du-Mont-Louis and Sainte-Madeleine-de-la-Rivière-Madeleine as well as the unorganized territory of Mont-Albert.
To learn more about the project, consult the Documents section above.
© Hydro-Québec, 1996-2012. All rights reserved.