To maintain sufficient supply for the current loads stemming from the 69/25 kV Montmorency substation, Hydro-Québec is planning to construct the 315/25kV Lefrançois substation in L'Ange-Gardien, and build a transmission line to connect the substation to the transmission grid.

Hydro-Québec is carrying out draft-design studies for the construction of Lefrançois substation and its connection to the transmission system.

To learn more about the project, consult the Documents section above.

* Previously called Dufournel substation.

Hydro-Québec's Home Page | Residential Customers | Business Customers | Energy Efficiency | Power Safety | Vegetation | Free Guided Tours | Learning | Corporate Profile and Publications | Press Releases | Sustainable Development | Construction Projects | Jobs [in French only] | Suppliers | Investors | Confidentiality and security