Power transmission – Integration of wind farms

161-kV Montagne-Sèche Wind Farm Line

At a Glance
Status: Under construction
Region: Gaspésie
Type: Growth in needs
Owner: Hydro-Québec TransÉnergie
Project supervision: Hydro-Québec Équipement et services partagés
Documents
Montagne-Sèche

Montagne-Sèche

To bring the output from the future Montagne-Sèche wind farm onto its transmission grid, Hydro-Québec must build new 161-kV lines. This entails building a new 161-kV line segment 27.8 km long between Montagne-Sèche and L'Anse-à-Valleau wind farms. Power will flow through this new line, then over an existing line to L'Anse-à-Valleau junction. From this junction to Rivière-au-Renard substation, a second line 10 km long will be built in the right-of-way of an existing line.

To provide Grande-Vallée substation with a more secure electricity supply, Hydro-Québec will also connect it to the new grid with a single-circuit line 16 km long.

To learn more about the project, consult the Documents section above.

Hydro-Québec's Home Page | Residential Customers | Business Customers | Energy Efficiency | Power Safety | Vegetation | Free Guided Tours | Learning | Corporate Profile and Publications | Press Releases | Sustainable Development | Construction Projects | Jobs [in French only] | Suppliers | Investors | Confidentiality and security