The goal of this project is to increase the energy interchange capacity between Québec and New England by building a 1,200-MW interconnection to link Québec’s power grid with new Hampshire’s. Commissioning is scheduled for 2015.

The project involves the construction of a 300-kV direct-current transmission line, about 75 km long. This line will be extended into the U.S.A. to connect Des Cantons substation to a substation to be built in Franklin, southern new Hampshire.

The project also includes the construction of two converters at Des Cantons substation, each with a capacity of about 600 MW. They will convert alternating current to direct current, to supply the planned transmission line.

To learn more about the project, consult the Documents section above.

You might also like to consult the following sources of information:

© Hydro-Québec, 1996-2014. All rights reserved.

Logo Hydro-Québec