Description
- New building
- Area: 5,110 m2, four floors
Planned electricity-saving measures
- Install T8 fluorescent tubes with electronic ballast
- Reduce lighting power density to 49% lower than reference building
- Install variable-speed drives on all HVAC fans
- Install heat recovery in heat-wheel and plate heat exchange HVAC systems
- Install SCRs or triacs on electric baseboard units on the building perimeter
- Install automatic controls for indoor lighting management
- Upgrade building envelope insulation from R17 to R23 (reference building)
Electricity consumption
1,220,501 kWh/year (reference building)
Electricity savings
372,248 kWh/year
Financial assistance
$55,589.94