Power Transmission Projects
| Status: | Under construction |
| Region: | Capitale-Nationale |
| Type: | Growth in energy requirements |
| Owner: | Hydro-Québec TransÉnergie |
In French only
This project involves the construction of a transformer substation in the western part of the Québec Metropolitan Community. The substations that serve this area will soon no longer have sufficient capacity to meet demand growth. The industrial park in Saint-Augustin-de-Desmaures, for example, is supplied mainly by La Suète substation. It is becoming increasingly difficult to serve the industrial park adequately because of its heavy loads and distance from the substation.
The project is subject to the environmental impact assessment and review procedure laid out under Sections 31.1 and following of the Environmental Quality Act. According to a preliminary estimate, the Anne-Hébert substation and supply line, which are currently in the draft design stage, will cost a total of $73.7 million. Commissioning is scheduled for fall 2010.
© Hydro-Québec, 1996-2009. Tous droits réservés.