Image: Eastmain-1-A/Sarcelle/Rupert Project
Link: Eastmain-1-A/Sarcelle/Rupert Project Home Page
Image : Diversion bay section
  Rupert dam
  Lemare dam
  Transfer tunnel
  Nemiscau-1 dam
  Nemiscau-2 dam
  Dikes
  Rupert
workcamp
Image : Increased-flow section
  Eastmain-1-A powerhouse
  Sarcelle powerhouse
  Eastmain
workcamp
Image : Reduced-flow section
  KP 290 weir
  KP 223 weir
  KP 170 weir
  KP 110.3 weir
  KP 85 weir
  KP 49 weir
  KP 33 weir
  Rock blanket,
KP 20.4
  Nemiscau
workcamp
Learn about the project and track its progress
Rupert Dam
Back to
main map
>>>
Link: Back to main map


Image: Date Sheet Link:  Photos Link: 3D Simulation
Dam

Rupert dam—the project's main dam—is located 314 km from the mouth of the Rupert River and will divert part of the flow from the Rupert River northward.
Structure Type Maximum height (m) Crest length (m) Volume of fill (m3)
Dam Rockfill 28.6 470 644,000(including cofferdams)

Spillway

The spillway is located to the left of Rupert dam. In addition to discharging floodwater, it releases the instream flow and discharges any flows in excess of the maximum flow of 800 m3/s that is diverted to Eastmain 1 reservoir through the transfer tunnel.

Number of gates 3
Maximum flow 3,470 m3/s