Transfer Tunnel
Back to
main map
>>>
Link: Back to main map


Image: Date Sheet Link:  Photos Link: 3D Simulation
The function of the transfer tunnel is to carry the river's diverted flow from the Rupert forebay into the Rupert tailbay. It is designed to handle a flow of 800 m3/s at a velocity of about 3.3 m/s.
Length 2,900 m
Height 18.6 m
Width 12.7 m