|
|
 |
 |
 |
|
Eastmain-1-A powerhouse is being built at the northern end of Eastmain 1 reservoir, next to the existing Eastmain-1 powerhouse. The turbines at both facilities will be driven by the flow from the upper Eastmain River, combined with the diverted flow from the Rupert River. |
|
| Number and type of generating units |
3 vertical-axis Francis turbines |
| Rated design flow |
1,344 m3/s |
| Rated capacity |
768 MW |
| Additional output |
2.3 TWh/yr |
|
|
 |
 |
|
 |
 |
|
 |