|
|
 |
 |
 |
|
Sarcelle powerhouse will be constructed at the northern end of Opinaca reservoir, next to the existing Sarcelle control structure. It is a surface powerhouse with a typical run-of-river configuration.
|
|
| Number and type of generating units |
3 bulb-type turbine generating units |
| Rated design flow |
1,290 m3/s |
| Installed capacity |
125 MW |
| Additional output |
0.9 TWh/yr |
|
|
 |
 |
|
 |
 |
|
 |