Expansion of Appalaches substation

Region
Chaudière‑Appalaches
Status
Under study
Type
Lines and substations
Expected completion date
2034

As part of the Appalaches⁠–⁠Bas‑Saint‑Laurent project, Hydro‑Québec plans to expand Appalaches substation, in Saint‑Adrien‑d’Irlande, in order to add a new 315‑kV section.

Project description Expanding a strategic substation in the transmission system

The transmission system needs to be upgraded to meet current and future needs, in particular those related to the development of wind potential in eastern Québec, and to improve grid reliability and resilience. It is within this context that Hydro‑Québec is developing the project to upgrade the main transmission system in the Appalaches⁠–⁠Bas‑Saint‑Laurent area.

The work planned for Appalaches substation is part of this project. The work involves adapting existing infrastructure by adding new equipment, which requires an expansion of the substation. With the expansion, it will be possible to integrate a new 315‑kV transformer section and maintain proper functioning of the transmission system.

The expansion will be primarily carried out on land that already belongs to Hydro‑Québec, on either side of the current substation. The selected scenario will help maximize the use of existing space and reduce the impacts on local land use, particularly on nearby tapped sugar bushes.

Throughout the project, Hydro‑Québec will pay particular attention to integrating facilities into the environment, reconciling the various ways the territory is used and taking into account the concerns expressed during the consultation steps.

A new 315‑kV transformer section

The work involves the addition of a new 315‑kV section located southwest of Appalaches substation. This new section will include two transformers, making it possible to lower the voltage from 735 kV to 315 kV, as well as two 315‑kV feeder bays. To accommodate the new section, the site needs to be expanded by approximately 200 metres by 600 metres. Once completed, the entire substation will cover a total area of about 600 metres by 600 metres.

Integrated Enhancement Program
Powering communities

The Integrated Enhancement Program (IEP) is a voluntary initiative by Hydro‑Québec, put in place to improve quality of life for communities affected by new transmission facilities (substations and lines). For more than 40 years, the program has helped develop, maintain and enhance collective spaces in every corner of Québec!

The Appalaches substation expansion project qualifies for this program.

Discover the program

Project schedule

This schedule may be adjusted as the project progresses. Visit our page on key project stages to learn more.

  1. 2027‑2029

    Government approvals

  2. 2029

    Clearing

  3. 2030‑2034

    Construction of the new section of the substation

  4. 2034

    Commissioning

The vital role of substations

What's an electrical substation and how does it work?

Explore an electrical substation. Discover the vital role it plays in the transmission and distribution of electricity, from the generating station to the home.

Running time: 5 minutes [in French only]

Frequently asked questions

Contact us

We’re committed to keeping the lines of communication open. Please send us your questions and comments about the project.

Info‑Project Line: 1 866 388‑1978

Ariane Doucet‑Michaud
Advisor – Regional Affairs
affairesregionales@hydroquebec.com

Pierre‑Antoine Morin
Advisor – First Nations and Inuit Relations
Morin.Pierre-Antoine@hydroquebec.com

Newsletter System upgrade – Appalaches–Bas‑Saint‑Laurent

Stay up to date on the project stages.