Construction of a substation in Bas‑Saint‑Laurent
- Region
- Bas‑Saint‑Laurent
- Status
- Under study
- Type
- Transmission
- Expected completion date
- 2032
Project to build a 315‑kV switching substation in the Saint‑Honoré‑de‑Témiscouata sector that will connect to the planned line in the Appalaches–Bas‑Saint‑Laurent corridor.
On this page
Overview A project that is essential to the development of the power system and Québec’s energy transition
Hydro‑Québec plans to build a substation in Saint‑Honoré‑de‑Témiscouata, in the Bas‑Saint‑Laurent region. The proposed site is located near the existing 315‑kV lines that connect Rivière‑du‑Loup and Madawaska substations. Covering an area of approximately 335 m by 470 m, the substation will house switchgear and protection equipment. Ultimately, new 315‑kV line feeders will be added to integrate the output from future wind farms.
Québec’s decarbonization efforts and energy transition will result in a considerable increase in electricity demand by 2050. To integrate the new generation capacity required to meet this growth, Hydro‑Québec must continue to develop its transmission system.
This project is essential to the continued development of eastern Québec’s wind power potential and will help improve grid reliability and resilience as weather events become increasingly intense.
Studies and consultations
As part of its public participation process, Hydro‑Québec is presenting the proposed substation site, which was selected based on environmental, social, technical and economic criteria. To identify the site, Hydro‑Québec worked closely with regional stakeholders. It also considered the concerns and comments expressed during previous consultation activities.
Proposed location
At the outset of the project, Hydro‑Québec defined a study area to determine the location with the least impact in the MRCs of Témiscouata and Rivière‑du‑Loup. Located near the existing lines, the area was thoroughly assessed to determine potential sites for the new substation.
Following an analysis of the sites and consultations with regional representatives, Hydro‑Québec selected a preferred location on public land in the municipality of Saint‑Honoré‑de‑Témiscouata. The proposed site is located 750 m from the 315‑kV line that connects Rivière‑du‑Loup and Madawaska substations, west of Autoroute 85. Covering an area of approximately 335 m by 470 m, the new substation will house switchgear and protection equipment.
Integrated Enhancement Program Powering communities
Hydro‑Québec believes that its power transmission facilities (lines and substations) should blend harmoniously into their environment. Through its Integrated Enhancement Program (IEP), Hydro‑Québec grants eligible organizations funding to enable them to carry out initiatives in which local residents have had a say.
For over 30 years, the IEP has helped develop, maintain, repair and enhance communities. Thanks to this program, more people are playing, skating, cycling, reading, laughing, and gathering across Québec. See for yourself!
Project schedule
This schedule is preliminary; dates may be adjusted as needed. See our page on key project stages to learn more about our structured process.
-
2024‑2027
Draft‑design phase: Technical studies, environmental assessment and public consultation
-
2027‑2029
Government approvals
-
2028‑2030
Preparatory work: Clearing, earthwork and access road construction
-
2030‑2032
Construction of the substation
Connection and commissioning of the substation
-
2034
Connection to the feeder line at Appalaches substation
Substations: Essential hubs
What’s an electrical substation and how does it work?
Explore an electrical substation. See the vital role it plays in transmitting and distributing power from the generating station to the home.
Running time: 5 minutes [in French only]
Documentation
- Project consultation – Winter 2025‑2026 [PDF 1.3 MB megabyte – in French only]
- Line route variants under study in the MRCs of Kamouraska and Témiscouata [PDF 640 kB kilobyte – in French only]
- Project consultation – Spring 2025 [PDF 1.3 MB megabyte – in French only]
- Project presentation – Fall 2024 [PDF 2.47 MB megabyte – in French only]
Contact us
We’re committed to keeping the lines of communication open. Please send us your questions and comments about the project.
Info‑Project Line: 1 866 388‑1978
Ariane Doucet‑Michaud
Advisor – Regional Affairs
affairesregionales@hydroquebec.com
Pierre‑Antoine Morin
Advisor – First Nations and Inuit Relations