Operational data specification
The NERC IRO-010-2 and TOP-003-3 standards stipulate that the Reliability Coordinator must maintain a documented specification for the data necessary to perform various analyses. Entities that have facilities monitored by the Reliability Coordinator or which provide it with data on the condition of their facilities have access to the document below:
Real and reactive power verification
Generator Owners and Operators must periodically verify the maximum real and reactive power of their facilities with a capacity of 50-MVA or more as per the procedure below:
They must submit their results using the form below: