Search
Log-in
Reliability Coordinator for Québec
  • Mandates
  • Reliability standards
  • Dislay menuDocumentation
  • Reliability news
  • FAQ
  • Contact us
  • Complaints
  • All sites
  • News
  • Contact us
  • Power outages
  • Français
Close submenuDocumentation
  • Public consultation of entities
  • Main Transmission System (RTP)
  • Applications to Régie de l’énergie
  • Operating instructions and reporting forms
  • All sites
  • News
  • Contact us
  • Power outages
  • Français
  • Skip to content
  • Skip to the footer's menu
  • All sites
  • News
  • Contact us
  • Power outages
  • Français
  • Log in
Hydro-Quebec
  • Reliability Coordinator for Québec
  • Menu
  • log in
  • Mandates
  • Reliability standards
  • Documentation
    • Public consultation of entities
    • Main Transmission System (RTP)
    • Applications to Régie de l’énergie
    • Operating instructions and reporting formsActive page
  • Reliability news
  • FAQ
  • Contact us
  • Complaints
Reliability Coordinator for Québec Documentation 

Operating instructions and reporting forms

Some reliability standards require that entities subject to them provide certain information to the Reliability Coordinator. This section helps entities subject to reliability standards identify this information.

IQ‑N‑001 – Voltage Schedule

Generator Operators (GOP) must ensure voltages and reactive power of their facilities are monitored, controlled and maintained in real-time to preserve equipment integrity and reliable operation of the transmission system.

  • IQ-N-001 – Voltage Schedule [PDF 260 KB]
  • Frequently Asked Questions for the voltage schedule [PDF 104 KB]

IQ‑N‑002 – Operational data specification

The Reliability Coordinator (RC), Balancing Authority (BA) and Transmission Operator (TOP) maintain a documented specification for the data necessary to fulfill their operational and planning responsibilities. Registered entities that have facilities monitored by the Reliability Coordinator must respect the requirements and procedures for reporting information and data needed to operate the transmission system of Québec:

  • Transmission of information to those responsible for reliability [PDF 126 KB]
  • IQ-N-002 - Data specification for HQCF [PDF 1.14 MB]
  • Standard Operating Requirements (SOR) [PDF 201 KB]

Previous versions

Specification for data information (2022-12-01) [PDF 750 KB]

Specification for data information (2022-04-01) [PDF 673 KB]

Specification for data information (2021-01-14) [PDF 1.3 MB]

Specification for data information (2019-06-01) [PDF 1.3 MB]

Specification for data information (2018-06-30) [PDF 535 KB]

Specification for data information (2016-12-23) [PDF 478 KB]

IQ‑P‑001 - Real and reactive power verification

Generator Owners and Operators must periodically verify the maximum real and reactive power of their facilities included in the Main Transmission System (RTP) as per the procedure below:

  • IQ-P-001 Procedure [PDF 471 KB]

They must submit their results using the form below:

  • IQ-P-001 Form – Appendix C [PDF 44.6 KB]

Liens importants

  • Lien vers les sections principales
    • Résidentiel
    • Affaires
  • Lien vers certains sites spécialisés
    • À propos
    • Mieux consommer
    • Conseils de sécurité
    • Nouvelles
    • Nous joindre
    • Info-pannes
    • Carrières
    • Tous nos sites
  • Infolettres
  • Suivez-nous
    • Facebook This link will redirect you to an external site.
    • Bluesky
    • X (Twitter) This link will redirect you to an external site.
    • LinkedIn This link will redirect you to an external site.
    • YouTube This link will redirect you to an external site.
    • Instagram This link will redirect you to an external site.
    • TikTok This link will redirect you to an external site.
  • App mobile
    • Apple StoreThis link will redirect you to an external site.
    • Google StoreThis link will redirect you to an external site.
  • Plan du site
  • Conditions et confidentialité
  • Gestion des témoins
  • Accessibilité
  • Nétiquette
  • Demande d'accès et vie privée

© Hydro-Québec, 1996-2025. Tous droits réservés.