The storage capacity of the Great Lakes is 22,950 billion cubic metres of water, or the equivalent of over six million Olympic pools.
Modernization of the Beauharnois-Les Cèdres hydropower complex
Priority work
Studies and investigations were carried out until the end of 2021. While that was being done, priority work on certain structures had also begun.
Consult the following documents to learn more about the planned work:
Îles‑de‑Saint‑Timothée regional park sector
- Environmental compensation project following work on structure 1
- Stabilization of structure 2 foundations ‑ André‑Lamanque bridge
- Refurbishment of bridges P‑128 and P‑129 linking Île aux vaches and Île Saveuse
- Notice of inventory of water intakes, waterside infrastructure and recreational uses of the Rivière Saint‑Charles [PDF 397 kB ‑ in French only]
Fleuve Saint‑Laurent structures sector
- Info-project – Replacement of a valve system near the Coteau-1 dam [PDF 301 kB - in French only]
- Public notice – Replacement of a valve system near the Coteau-1 dam – April 2025 [PDF 515 kB]
- Info-project – Addition and replacement of booms on Fleuve Saint-Laurent [PDF 416 kB]
Beauharnois Canal sector
- Project News – Postponed work (Hungry Bay) [PDF 234 kB – in French only]
- Project News Reconstruction of the Canal Saint-Louis (Hungry Bay) Intake [PDF 2.2 MB]
- Refurbishment of the Beauharnois road bridge (Route 132)
- Refurbishment of Beauharnois Canal dikes
Project site of priority work
Click on the different elements shown on the map below
to find out more.
Info-Project – Modernization of the Beauharnois–Les Cèdres hydropower complex
Stay informed on the stages of the project and the progress of work.
Subscribe to Modernization of the Beauharnois–Les Cèdres hydropower complex newsletter