Work Safety Code – Distribution

Do you need to perform work on Hydro‑Québec’s distribution system? To know which safety measures to apply, make sure you have a thorough understanding of the Work Safety Code (WSC).

Work Safety Code – Distribution [PDF 588 kB- in French only]

Have you taken your Work Safety Code (WSC) training?

To work on a Hydro‑Québec jobsite or in one of its facilities, you first need to undergo training on the Work Safety Code (WSC). Consult the list of WSC training sessions.

Consult the WSC training sessions – Distribution

Videos that explain certain procedures in detail

Video | Transfer envelope procedure – WSC – Distribution (in French only)

This video outlines the procedure to follow to prepare and seal a transfer envelope when there is a change of worker in charge (WIC) if the former WIC and new WIC do not meet one another.

This procedure applies to Distribution.

Duration: 2 minutes 59 seconds

Video | Indirect change, worker in charge (WIC) – WSC – Distribution (in French only)

This video outlines the procedure to follow when there is a change of worker in charge (WIC) if the former WIC and new WIC do not meet one another.

The steps that the WIC must take before leaving their work site and the steps that the new WIC must take when they arrive are explained in the video.

This procedure applies to Distribution.

Duration: 3 minutes 12 seconds

Video | Authorization procedure for cutting an individual lock – WSC (in French only)

This video outlines the procedure to follow to authorize the cutting of an individual lock.

This procedure applies to all the chapters.

Duration : 2 minutes 59 seconds