Work Safety Code – Transmission Lines
Do you need to perform work on a Hydro‑Québec transmission line? To know which safety measures to apply, make sure you have a thorough understanding of the Work Safety Code (WSC).
Work Safety Code – Transmission Lines [PDF 541 kB - in French only]
Have you taken your Work Safety Code (WSC) training?
To work on a Hydro‑Québec jobsite or in one of its facilities, you first need to undergo training on the Work Safety Code (WSC). Consult the list of WSC training sessions.
Consult the WSC training sessions – Transmission LinesDocuments you may find interesting [in French only]
Videos that explain certain procedures in detail
Video | Indirect change, worker in charge (WIC) – WSC – Generating Stations, Substations and Transmission Lines – Part 1 (in French only)
This video outlines the procedure to follow when there is a change of worker in charge (WIC) if the former WIC and new WIC do not meet one another.
The steps that the WIC must take before leaving their work site are explained in the video.
This procedure applies to Generating Stations, Substations and Transmission Lines.
Duration: 2 minutes 2 seconds
Video | Indirect change, worker in charge (WIC) – WSC – Generating Stations, Substations and Transmission Lines – Part 2 (in French only)
This video outlines the procedure to follow when there is a change of worker in charge (WIC) if the former WIC and new WIC do not meet one another.
The steps that the new WIC must take when they arrive at their work site are explained in the video.
This procedure applies to Generating Stations, Substations and Transmission Lines.
Duration: 1 minute 24 seconds
Video | Transfer envelope procedure – WSC – Transmission Lines (in French only)
This video outlines the procedure to follow to prepare and seal a transfer envelope when there is a change of worker in charge (WIC) if the former WIC and new WIC do not meet one another.
This procedure applies to Transmission lines.
Duration: 2 minutes 47 seconds
Video | Authorization procedure for cutting an individual lock – WSC (in French only)
This video outlines the procedure to follow to authorize the cutting of an individual lock.
This procedure applies to all the chapters.
Duration : 2 minutes 59 seconds